Commissioning readiness

Commissioning slipped by weeks. A clearance nobody spotted, a section left out, a permit that took a fortnight.

Commissioning is where every unresolved question surfaces at once. Criad keeps each system's install status, its outstanding clearances and the access it needs in one record, so the commissioning team can see what is ready, what is blocked and what each block is waiting on, before the commissioners are booked.

Every answer cites its source. People decide.

How it works

Ask. Inspect. Verify. Publish.

1

Ask

A plain-language question.

"What is holding up commissioning in this hall?"
2

Inspect

The full blast radius, on the model.

Each system in the hall, coloured by install status, with the elements that are not started or not cleared.
3

Verify

Checked against the governing drawings and specs.

Status is read per element. Clearances are measured on the model against the spec. Access restrictions and permits are listed from the register.
4

Publish

A dashboard, report or register, citations attached.

A readiness report per system: ready, blocked, and the reason for each block, with the source named.
Worked example

One job, start to finish.

Values come from a structured reference campus, not from a client project.

Reference campus
  1. 01

    Reference campus, day 90 report.

  2. 02

    Hall 2: 0 of 16 electrical cabinets installed, work package A4401.

  3. 03

    Anything that depends on that package is shown as waiting on it.

  4. 04

    Sprinkler heads within 457 mm of a tray wider than 300 mm are listed against NFPA 13 before the fire engineer walks the hall.

  5. 05

    The report goes to the commissioning agent with the evidence, not a feeling.

Hall 2 · DH_02 Hall 2 · package A4401 and the fire system
Highlighted: the elements the answer refers to

Stop waiting. Start building.