A handover record that operates
Handover is a pile of files. Operations starts by rebuilding the record.
The handover is the links, kept alive. Each element keeps its O&M row, its warranty and its power and fibre paths, so the record stays live and queryable for decades.
Every answer cites its source. People decide.
How it works
Ask. Inspect. Verify. Publish.
Ask
A plain-language question.
Inspect
The full blast radius, on the model.
Verify
Checked against the governing drawings and specs.
Publish
A dashboard, report or register, citations attached.
One job, start to finish.
Values come from a structured reference campus, not from a client project.
- 01
"Which rack is this?" Schedule row, spec and approvals attached.
- 02
"What serves it?" Rack, distribution frame, fibre entry.
- 03
"Still under warranty?" O&M row and warranty on record.
- 04
Example queries from a structured reference campus.
42U RACK · DATA HALL
- 0.60 × 1.20 × 2.00 m
- 240 per hall
- 1 of 1,440 on campus
- measured in
3D MODEL
Real geometry, shared origin: sizes and
clearances are measured, never guessed
- drawn on
GOVERNING DRAWING
telecom layout · rev 1 · issued 17 Jul 2026
a new revision updates every element on it
- limited by
SPEC CLAUSE
envelope max 0.60 × 1.20 × 2.00 m · telecom spec
✓ checked automatically, every revision
- ordered as
PRODUCT & ORDER
one approved product · 1,440 units
approve once, the whole order updates
- built under
PROGRESS
status per rack · phase-aware, both phases
reports roll up live, nothing retyped
- operated as
OPERATIONS
O&M row · warranty · fibre & power paths
the handover is these links, kept alive
real values from a structured reference campus
Platform capabilities used
The same capabilities serve every segment. Each one links to its section.
Stop waiting. Start building.
Book a call with the founders. Thirty minutes, your questions, and what Criad looks like on a data centre build.