Approve a change with every knock-on in view
We asked for a change to the cooling units on one page. The knock-ons arrived later, as claims.
One change is never one change. Before you approve it, see what it touches: the product order, the governing drawing, the install plan. The evidence is in front of the person who decides.
Every answer cites its source. People decide.
How it works
Ask. Inspect. Verify. Publish.
Ask
A plain-language question.
Inspect
The full blast radius, on the model.
Verify
Checked against the governing drawings and specs.
Checked against the governing drawings and specs. Allowed depth 0.92 m. Requested 1.0 m is 0.08 m over.
Publish
A dashboard, report or register, citations attached.
One job, start to finish.
Values come from a structured reference campus, not from a client project.
- 01
Reference campus: the client asks for liquid cooling in Hall 2 instead of the 16 air units.
- 02
In the hall, the deeper units cut the clearance to the nearest rack from 1.45 m to 0.55 m, under the 0.6 m spec minimum.
- 03
In the yard, the 6 chillers were sized for air-cooled halls and 87 pipe runs were sized to a 3 m/s limit. Both are re-checked before the order.
- 04
The approval goes out with every knock-on listed, and the claims do not arrive later.
Platform capabilities used
The same capabilities serve every segment. Each one links to its section.
Stop waiting. Start building.
Book a call with the founders. Thirty minutes, your questions, and what Criad looks like on a data centre build.