Tenant standards, checked before the corridor is built

The tenant has its own pathway and conduit standard. We found the difference after the corridor was built.

Every tenant brings a standard of its own for pathways, conduit, containment and labelling, and it rarely matches the base-build spec line for line. Criad loads the tenant standard beside the spec, shows where the two disagree, and checks the model against both before the corridor is built, not after.

Every answer cites its source. People decide.

How it works

Ask. Inspect. Verify. Publish.

1

Ask

A plain-language question.

"Where does the tenant standard differ from our spec on this corridor?"
2

Inspect

The full blast radius, on the model.

The pathway on the model, end to end, with the containment, conduit and fixings the design shows.
3

Verify

Checked against the governing drawings and specs.

Each requirement in the tenant standard is checked against the spec and the model. Disagreements are listed with both clauses; the governing one is named.
4

Publish

A dashboard, report or register, citations attached.

A departures list per corridor, clause by clause, for the client to settle before the work is priced and built.
Worked example

One job, start to finish.

Values come from a structured reference campus, not from a client project.

Reference campus
  1. 01

    Reference campus, Hall 2: the containment run is one connected path on the model.

  2. 02

    Each element on it knows the sheet it is drawn on and the clause that limits it.

  3. 03

    A tenant standard is loaded as one more document and ranked against the spec and the code: 360 degrees of bend between pull points (NEC, TIA-569), 200 mm power to data separation for unscreened cables (EN 50174-2).

  4. 04

    The differences are listed, with both clauses, before anything is built.

Tenant standard against drawing · containment route

governs
PDFTenant pathway standardpage 17 of 64

Stricter than the code limit of 360 degrees

No junction boxes on tenant pathways.

Total bend between pull points shall

not exceed 180 degrees.

Pull points shall be shown on the drawings.

17 of 64

Ranked by authority

Counted on the drawing

360 degrees

PDFLV containment, riser to Hall 21 sheet · A1

rev 1 · pull points shown

Riser drop: 4 × 90 degree turns

between the frame and the first pull point

Reference campus

LV containment, riser to Hall 2

rev 1

pull points shown

Within the code limit, over the tenant limit of 180. The comms drawing shows no pull points at all: raised as a question.