Sequencing and work zones you can check
The master schedule says which month. It does not say which crane, which zone, or which trade has to be out of the room.
Heavy plant lifts, live electrical work and mechanical installs cannot share a space or a week. Criad links each work package to the elements and the zone it works in, so a proposed sequence can be checked on the model: what is in the way, which zone is live, which room needs a permit, and which trade is waiting on which.
Every answer cites its source. People decide.
How it works
Ask. Inspect. Verify. Publish.
Ask
A plain-language question.
Inspect
The full blast radius, on the model.
Verify
Checked against the governing drawings and specs.
Publish
A dashboard, report or register, citations attached.
One job, start to finish.
Values come from a structured reference campus, not from a client project.
- 01
Reference campus, Hall 2: the 16 electrical cabinets sit in work package A4401.
- 02
Every package that depends on A4401 is shown as waiting on it.
- 03
A lift planned through that bay is checked against what is already installed there.
- 04
The conflicts go into the meeting with the evidence, not into the following week.
Platform capabilities used
The same capabilities serve every segment. Each one links to its section.
Stop waiting. Start building.
Book a call with the founders. Thirty minutes, your questions, and what Criad looks like on a data centre build.