Submittal check
The submittal sat for weeks, then came back rejected on a clause nobody flagged.
The submitted product is checked against the spec clause and the space it has to fit, before it goes in. Once the reviewer approves it, every unit on site updates to the approved product.
Every answer cites its source. People decide.
How it works
Ask. Inspect. Verify. Publish.
Ask
A plain-language question.
Inspect
The full blast radius, on the model.
Verify
Checked against the governing drawings and specs.
Publish
A dashboard, report or register, citations attached.
One job, start to finish.
Values come from a structured reference campus, not from a client project.
- 01
Reference campus: rack envelope limit 0.60 x 1.20 x 2.00 m, from the spec.
- 02
One approved product, 1,440 units.
- 03
The reviewer approves once and the whole order updates.
- 04
The check runs again automatically on every revision.
- Electrical cabinets96model: yeschecked: yesRequested 1.0 m depth is 0.08 m over the 0.92 m spec limit.
- Data racks1,440model: yeschecked: yesno open item
- Hall 2 cabinets16model: yeschecked: yesAll 16 not started at the day 90 report, package A4401.
- Contract sheets152model: yeschecked: yesno open item
- Published files315model: yeschecked: yesno open item
Where the model, the drawings and the spec disagree, as of the current revision. Values from a reference campus.
Platform capabilities used
The same capabilities serve every segment. Each one links to its section.
Stop waiting. Start building.
Book a call with the founders. Thirty minutes, your questions, and what Criad looks like on a data centre build.