Factory against site revisions
The site drawing moved after the factory drawing was frozen. We found out at delivery.
Factory drawings and site drawings are connected to the same elements. When either side issues a revision, the elements it touches are flagged, and the other side sees it before the unit ships.
Every answer cites its source. People decide.
How it works
Ask. Inspect. Verify. Publish.
Ask
A plain-language question.
Inspect
The full blast radius, on the model.
Verify
Checked against the governing drawings and specs.
Publish
A dashboard, report or register, citations attached.
One job, start to finish.
Values come from a structured reference campus, not from a client project.
- 01
The telecom layout on the reference campus goes from rev 1 to rev 2.
- 02
Every rack drawn on that sheet is flagged.
- 03
Factory drawings that describe those racks are listed against the change.
- 04
Your engineer sees it while the unit is still in the factory.
illustrative example
What rev 2 touches
- Rack row C moved 0.60 m
- 12 racks affected
- Install plan: 1 package to re-sequence
- Who needs to know: 3 trades
Flagged before anyone builds to the old sheet.
Platform capabilities used
The same capabilities serve every segment. Each one links to its section.
Stop waiting. Start building.
Book a call with the founders. Thirty minutes, your questions, and what Criad looks like on a data centre build.