Envelope and clearance
Will it fit where it is going: envelope, weight, and the clearance to service it?
Load the open spec as a document: Open Rack V3 (ORv3), Open Rack Wide, or the Project Deschutes CDU specification. Criad checks rack envelope and weight against the hall, and CDU service clearance against the spec, measured on the model.
Every answer cites its source. People decide.
How it works
Ask. Inspect. Verify. Publish.
Ask
A plain-language question.
Inspect
The full blast radius, on the model.
Verify
Checked against the governing drawings and specs.
Publish
A dashboard, report or register, citations attached.
One job, start to finish.
Values come from a structured reference campus, not from a client project.
- 01
Reference campus: rack envelope limit 0.60 x 1.20 x 2.00 m, from the spec.
- 02
240 racks per hall, 1,440 on campus, each one measured on the model.
- 03
A rack over the envelope is listed with its hall, its position and the clause.
- 04
The same check runs with ORv3 or Open Rack Wide loaded as the spec.
Spec against drawing · cooling unit clearance
Maintenance clearance clause
Cooling units shall be installed so that
the clear space to the nearest rack is
not less than 0.6 m for maintenance.
Clearance is measured to the rack face.
42 of 118
Ranked by authority
Measured on the model, all 16 units
1.45 m
rev 1 · issued 17 Jul 2026
Plan detail, unit to nearest rack row
Reference campus
Hall 2 cooling layout
rev 1
issued 17 Jul 2026
Platform capabilities used
The same capabilities serve every segment. Each one links to its section.
Stop waiting. Start building.
Book a call with the founders. Thirty minutes, your questions, and what Criad looks like on a data centre build.