See how Criad gives every role on the project instant access to the data they need — no specialist required.
Revit, Navisworks, IFC, Tekla — pulled into one live model automatically. No manual merges, no stale exports, no 'which version are you looking at?' Coordinates, units, and naming align on ingest. Every discipline sees every other discipline, live.
Ask in plain English. 'How many steel beams on Level 3?' '247 beams, 1,842 tonnes, last updated 2 minutes ago.' Quantities, element lists, and focused 3D views — returned in seconds, shareable by link. No BIM specialist queue. No Navisworks licence.
See what changed, when, and by whom — across geometry and attributes like materials, fire ratings, and structural grades. Rank impact by cost and trade before it hits site. The column moves at 2pm Tuesday; the MEP coordinator knows at 2:01pm.
Quantities extracted directly from federated 3D geometry — not interpreted from 2D drawings. Group by trade, package, or zone. When the model changes, quantities update automatically. No re-counting. No 'which version did we take off from?'
Bill of materials and cost rollups derived from model attributes — live. When a spec changes from aluminium to steel, the BOM and cost update automatically. Track deltas over time. Know exactly what changed and what it costs, before the next client meeting.
Review tender models and documents before committing resources. Understand scope from the model geometry, flag risks and gaps, and make a confident go/no-go decision in hours. Data-driven qualification, not gut feel and guesswork.
Review models and documents side by side. Draft a grounded 4D plan from the model. Surface constructability risks and scope gaps automatically. Package quantities, costs, and risk summaries for estimating — all from one federated source that stays current.
Continuous value engineering, not a one-time meeting. Analyse geometry and specifications across similar elements. Swap materials and methods. See visual comparisons with cost impacts in the same session. Present credible alternatives during the bid, not after.