Value Engineering
VE happens once, late in the process, in a workshop nobody prepared for. The savings identified are never implemented.
Continuous value engineering, not a one-time meeting. Analyse geometry and specifications across similar elements. Swap materials and methods. See visual comparisons with cost impacts in the same session. Present credible alternatives during the bid, not after.
VE options identified and costed in hours. Present in the same meeting you discover them.
Current spec
Aluminium curtain wall
£340/m² · 2,800 m²
£952,000
VE alternative
Unitised glazing system
£285/m² · 2,800 m²
£798,000
Projected saving
-£154,000
16.2% reduction · same performance spec
How it works
Three steps. No training required.
Analyse
AI identifies substitution opportunities across similar elements
Compare
Side-by-side materials, methods, and specs with cost impact
Present
Credible alternatives ready for the meeting — not after
What this unlocks
Pattern analysis across similar elements for substitution opportunities
Compare alternative materials, methods, and specs side by side
Visual before/after comparisons in federated 3D
Cost impact quantified instantly — present with confidence